01/07/10 – And now for something completely different. Ever heard of Steam Punk? It’s a design vocabulary founded on Victorian styling blended with technology as it might have been had we not moved into micro-electronics. Time machine movies are excellent examples of the aesthetic. Applying this to an SSL product just seems too ironic not to do, so this will be the week two project. This one is going to use Bridgelux 400lm LED arrays as uplight and downlight, within a pivoting head. Driver will be from Luxdrive, and operated at 1A. Control is going to be via placing a plumb bob in one of three sockets, which will control the driver dim level. Finishes will be powder coat red, powder coat black, polished aluminum and polished brass. This one is mostly lathe turnings, my favorite tool.

Bent part - tip of vertical members

01/11/10 –  Got a lot of parts made and some details figured out. Had a bit of an issue with the ball turner, which decided to grab a part and bend it over on me. Really a pain since the ball is the last thing you turn after cutting the rest of the part. Had to re-invent the tool a little before I trashed another blank, then started all over to replace the bent part. Been making a few adjustments in detail as I go through each part – some to fit materials I have in stock and to improve detailing, since there is nothing quite like having the metail in hand to fine tune detail. Working the light heads now – a lot of stuff packed into a somewhat small space. Last bit to work out is the swivel so it will hold the head in place and not sag, but will be easy to adjust. So far so good. The Bridgelux LEDs put out so much soft light, this one should make a nice general space illuminator, with back/uplight and down/tasklight.

01/15/10 – Been a tough week, but the project is progressing. Just finished the base plates, have the vertical conductor towers ready to finish, have figured out how to make the controls work properly, and have the head 90% complete, just need a couple of holes drilled and everything is ready to finish. While the target is to finish each of these on Thursday or Friday of each week, projects like this one are abit more complex, so will take a day or two longer. By the end of the day today, everything on this will be in finishing, with assembly tommorrow (Saurday), just in time to startweek 3, which has already beed designed. This is going to be tough to keep up with, and requires I think clearly and not make any serious mistakes that eat time.

Comments
  1. Ken Reynar says:

    One of my favorite design themes. Looking forward to seeing this one!

  2. “Steam punk” ? very cool….. heh heh ….

    Can’t wait to see this one…..

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s